Skip Navigation
This table is used for column layout.
 
ConserveAgendas 2013/01/08
Orleans Conservation Commission                                 

Work Meeting    Nauset Room                     January 8, 2013

8:30 a.m.       Call to Order   

Continuations
Last Heard 12/11/12
Ken Eisner, Countryside Building & Development          8 High Street
by Ryder & Wilcox, Inc. Assessor’s Map 37, Parcel 12.  The proposed construction of a single family dwelling; installation of a septic system and utilities; construction of a driveway; grading; landscaping; and mitigation.  Work will occur within 100’ of an Intermittent Stream and the Edge of Two Wetlands.  

Last Heard 12/4/12
Gary & Ethel R. Furst                                   27 Beach Plum Lane.  
by Coastal Engineering Company, Inc. Assessor’s 23, Parcel 3.  The proposed repair of an existing licensed timber bridge & revetment maintenance.  Work will occur on a Salt Marsh, in Land Subject to Coastal Storm Flowage, within the Cape Cod Bay A.C.E.C. and over Namskaket Creek.

Revised Plan
Last Heard 11/13/12
Robert & Sally Roda                                     187 Namequoit Road
The proposed installation of scour protection and beach nourishment on a Coastal Bank. Plans have been revised to present a revised grading schematic; the addition of 200 cubic yards of fill to the Coastal Bank; the installation of a Geocell layer on the Coastal Bank; the modification of the planting plan; and the removal of the existing groin to be used as toe stones.  Work will occur on a Coastal Bank, Coastal Beach, Land Under the Ocean, and within 100’ of the Top of a Coastal Bank

Charles Silbert                                         33 Gesner Road
The proposed removal of an existing dwelling and cesspool, and the construction of a new single family dwelling, garage, driveway, and septic system has been revised to relocate the proposed driveway and moving the limit of work further from the buffer zone to the resource area.  Work will occur within 100’ of the Edge of Wetland, Top of a Coastal Bank, Land Subject to Coastal Storm Flowage, and within the Pleasant Bay A.C.E.C.  

Certificate of Compliance
Francis E. Lajoie (1984)                                        23 Pochet Road
The request for a Certificate of Compliance for an Order of Conditions for the construction of a single family residence with a porch and garage.  

Administrative Reviews
Gary Webster                                            28 Twinings Lane
The proposed removal of 4 pitch pines.  Work will occur within 100’ of the Top of a Coastal Bank.  Work to be done by Bartlett Tree.  

Peter Rush                                                      10 Sparrow Lane
The proposed removal of 2 storm damaged trees.  Work will occur within 100’ of the Top of a Coastal Bank, Land Subject to Coastal Storm Flowage, and within the Pleasant Bay A.C.E.C.

Richard Rowson                                          14 Alden Road
The proposed replacement of an existing deck within the same footprint, handrails and stairs to be modified.  Work will occur within 100’ of the Edge of Wetland.  Work to be done by Michael Ciampa.  
        
Bruce Taylor                                                    3 Larboard Lane
The proposed removal of a down black cherry.  Work will occur within 100’ of the Edge of Pond.

Chairman’s Business
Approval of the Minutes from the Meeting on December 18, 2012

Other Business
Vote to authorize expending funds from the Wetlands Filing Fees Account for Commissioner training.
        -Request to expend up to $60 to participate in upcoming MACC Training

Site Visits
David Wiener                                            72 Keziah’s Lane
by East Cape Engineering, Inc. Assessor’s Map 49, Parcel 53.  The proposed removal of an existing licensed pier and float, and construction of a new pier and seasonal float.  Work will occur within a Salt Marsh, Land Under Water, Land Subject to Coastal Storm Flowage, and within the Pleasant Bay A.C.E.C.

Clifford Hampton & Thomas P. Heiser                     27 & 34 Carlton Road
by Ryder & Wilcox, Inc. Assessor’s Map 82, Parcel 1 & 2.  The proposed replacement of an existing timber stairway and the stabilization of an eroding Coastal Bank with gabions.  Work will occur on Land Subject to Coastal Storm Flowage, on a Coastal Beach, and within the Pleasant Bay A.C.E.C.  

Stephen Brodeur                                         25 Weeset Proprietors Way
by Coastal Engineering Company, Inc. Assessor’s Map 6, Parcel 4.  The proposed property redevelopment including select structural & site demolition; reconstruction & reconfiguration of the existing dwelling; installation of a new septic system; & the enlargement of buffer planting areas.  Work will occur within 100’ of the Top of a Coastal Bank and within Land Subject to Coastal Storm Flowage and the Pleasant Bay A.C.E.C.

The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting.  Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.